Image from Google Jackets
Image from OpenLibrary

Optimizing construction efficiency: a comprehensive analysis of factors influence the timely completion of the CBE building at Nueva Vizcaya State University/ Roanne Maye O. Arquero, Rejie M. Carino, Annabelle D.C Casanding, Febe K. Ngaloy, Chrysler Von T. Niwanne and Mheziah Kaye N. Recamara

By: Contributor(s): Material type: TextTextPublication details: Bayombong: Nueva Vizcaya State University, 2023.Description: viii, 91 leaves : illustrations (some colored), photos ; 28 cm
Item type: Undergraduate Research
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Status Barcode
Undergraduate Research Nueva Vizcaya State University - Bayombong Campus General Reference Section U (BSCE) Ar772o 2023 (Browse shelf(Opens below)) Not for loan U2028
Browsing Nueva Vizcaya State University - Bayombong Campus shelves, Shelving location: General Reference Section Close shelf browser (Hides shelf browser)
No cover image available No cover image available
No cover image available No cover image available
No cover image available No cover image available
No cover image available No cover image available
No cover image available No cover image available
No cover image available No cover image available
No cover image available No cover image available
U (BSCE) Ar664s 2024 Safety management of construction project initiative, constraints and improvements measures: its implication to selected constructions firms/ U (BSCE) Ar666f 2023 Factors affecting manpower shortage in the construction of quezon multi-purpose buildin/ U (BSCE) Ar712l 2024 Levels of awareness, acceptability, and relevance of NVSU vision, mission, developmental goals, and core values, and the objectives of the bs civil engineering program/ U (BSCE) Ar772o 2023 Optimizing construction efficiency: a comprehensive analysis of factors influence the timely completion of the CBE building at Nueva Vizcaya State University/ U (BSCE) Au887p 2023 Performance management strategies related to planning scheduling, and quality control of material on the construction of three-storey residential building/ U (BSCE) B116e 2024 Evaluation of flood control structure and community resilience at barangay Paitan, Vista Alegre, and Santa Rosa Bayombong, Nueva Vizcaya/ U (BSCE) B191c 2023 Construction project management of proposed three-storey academic building/

The construction industry is a complex and dynamic sector that plays a crucial role in economic development. Despite this importance, construction projects are often plagued with delays that can significantly impact project timelines, increase costs, and affect the quality of the final product. To understand the vulnerability of real-time projects to different factors of delays, this study investigates the construction project for the College of Business Education (CBE) building at Nueva Vizcaya State University Bayombong Campus, focusing on the identification and analysis of factors that contribute to project delays and determine the strategies employed by the project participants to minimize the delay in the construction project. Through qualitative research methods and document review, the study identified factors influencing delays in the construction project in terms of (a) production elements (PE) is materials price fluctuations: (b) internal environment (IE) are delay in mobilization, improper technical study by the contractor during the bidding stage, financial difficulties faced by the contractor, delays in contractor's payments to subcontractor, too many additional orders from implementing agency, delay in progress payments by the implementing agency, and financial constraints faced by the implementing agency; and (c) external environment (EE) are severe weather conditions on the job site, and government regulations and laws. Meanwhile, the strategies employed by the respondents in response to the delays in the said construction project are communication and collaboration, creating recommendation plans, implementing temporary weather solution, and risk management. The study emphasizes the need to understand and address the diverse factors causing delays in construction projects to ensure timely completion and client satisfaction. Additionally, it depends on the nature of the delay factors on what possible measures and strategies can be taken to avoid or minimize these factors of delay to complete a construction project on time, on budget, with applicable quality, and keeping in mind the client's specifications and satisfaction.

Keywords: delays in construction project, project management, strategies on delays

Research paper (Bachelor of Science in Civil Engineering - Construction
Engineering Management)

Includes bibliographical references and appendices

There are no comments on this title.

to post a comment.

NUEVA VIZCAYA STATE UNIVERSITY

A leading University in education, innovation and sustainable development

@2024 NVSU | Powered by : Koha