Optimizing construction efficiency: a comprehensive analysis of factors influence the timely completion of the CBE building at Nueva Vizcaya State University/ (Record no. 532)

MARC details
000 -LEADER
fixed length control field 03392nam a22002417a 4500
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20250331082148.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 250331b |||||||| |||| 00| 0 eng d
040 ## - CATALOGING SOURCE
Transcribing agency NVSU
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Arquero, Roanne Maye O.
245 ## - TITLE STATEMENT
Title Optimizing construction efficiency: a comprehensive analysis of factors influence the timely completion of the CBE building at Nueva Vizcaya State University/
Statement of responsibility, etc. Roanne Maye O. Arquero, Rejie M. Carino, Annabelle D.C Casanding, Febe K. Ngaloy, Chrysler Von T. Niwanne and Mheziah Kaye N. Recamara
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Bayombong:
Name of publisher, distributor, etc. Nueva Vizcaya State University,
Date of publication, distribution, etc. 2023.
300 ## - PHYSICAL DESCRIPTION
Extent viii, 91 leaves :
Other physical details illustrations (some colored), photos ;
Dimensions 28 cm.
500 ## - GENERAL NOTE
General note The construction industry is a complex and dynamic sector that plays a crucial role in economic development. Despite this importance, construction projects are often plagued with delays that can significantly impact project timelines, increase costs, and affect the quality of the final product. To understand the vulnerability of real-time projects to different factors of delays, this study investigates the construction project for the College of Business Education (CBE) building at Nueva Vizcaya State University Bayombong Campus, focusing on the identification and analysis of factors that contribute to project delays and determine the strategies employed by the project participants to minimize the delay in the construction project. Through qualitative research methods and document review, the study identified factors influencing delays in the construction project in terms of (a) production elements (PE) is materials price fluctuations: (b) internal environment (IE) are delay in mobilization, improper technical study by the contractor during the bidding stage, financial difficulties faced by the contractor, delays in contractor's payments to subcontractor, too many additional orders from implementing agency, delay in progress payments by the implementing agency, and financial constraints faced by the implementing agency; and (c) external environment (EE) are severe weather conditions on the job site, and government regulations and laws. Meanwhile, the strategies employed by the respondents in response to the delays in the said construction project are communication and collaboration, creating recommendation plans, implementing temporary weather solution, and risk management. The study emphasizes the need to understand and address the diverse factors causing delays in construction projects to ensure timely completion and client satisfaction. Additionally, it depends on the nature of the delay factors on what possible measures and strategies can be taken to avoid or minimize these factors of delay to complete a construction project on time, on budget, with applicable quality, and keeping in mind the client's specifications and satisfaction.<br/> <br/>Keywords: delays in construction project, project management, strategies on delays
500 ## - GENERAL NOTE
General note Research paper (Bachelor of Science in Civil Engineering - Construction <br/>Engineering Management)
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Includes bibliographical references and appendices
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Carino, Rejie M., author.
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Casanding, Annabelle D.C., author.
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Ngaloy, Febe K., author.
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Niwanne, Chrysler Von T., author.
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Recamara, Mheziah Kaye N., author.
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Undergraduate Research
Suppress in OPAC No
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Shelving location Date acquired Source of acquisition Total checkouts Full call number Barcode Date last seen Price effective from Koha item type
    Dewey Decimal Classification     Nueva Vizcaya State University - Bayombong Campus Nueva Vizcaya State University - Bayombong Campus General Reference Section 03/31/2025 Donation   U (BSCE) Ar772o 2023 U2028 03/31/2025 03/31/2025 Undergraduate Research

NUEVA VIZCAYA STATE UNIVERSITY

A leading University in education, innovation and sustainable development

@2024 NVSU | Powered by : Koha