245 _aFactors of delay on the completion of the “construction of campus drainage system/flood control bayombong campus/
_cJet Brian H. Distor, Thomas Gabriel B. Lumanog, Uniz Elizee D. Paringit, Symon Justine A. Rivera, Janica Mae D. Saguid, Nicole Angela C. Sesbreno
260 _aBayombong:
_bNueva Vizcaya State University,
_c2023.
300 _avi, 40 leaves :
_billustrations, photos ;
_c28 cm.
500 _a This study was conducted to determine the factors causing delay in the completion of "Construction of Drainage Canal System Flood Control, Bayombong Campus." Three factors, Le, manpower, weather conditions, and construction strategies, were given locus. Data were obtained through a survey and analyzed using a descriptive-qualitative research design Results of the study showed that a shortage of manpower was the primary cause of delay in terms of manpower, typhoons in terms of weather conditions, and budget inaccuracies in terms of construction strategies. It is recommended that project managers develop contingency plans to mitigate the effects of these factors on project timelines. In addition, it is also advised that project stakeholders work together to ensure proper planning, execution, and monitoring of projects to minimize delays and ensure timely project completion. Keywords: delay, construction, manpower factors, weather condition factors, construction strategies factors
500 _aResearch paper (Bachelor of Science in Civil Engineering)
504 _aIncludes bibliographical references and appendices
700 _aLumanog, Thomas Gabriel B., author.
700 _aParingit, Uniz Elizee D., author.
700 _aRivera, Symon Justine A., author.
700 _aSaguid, Janica Mae D., author.
700 _aSesbreno, Nicole Angela C., author.
942 _2ddc
_cU
_n0
999 _c523
_d523