000 02961nam a22002297a 4500
003 OSt
005 20250328142043.0
008 250328b |||||||| |||| 00| 0 eng d
040 _cNVSU
100 _aPesa, Xavier A.
245 _aPlanning and scheduling of construction improvements of access roads leading to declared tourism destinations/
_cXavier A. Pesa, Jaylord P. Perhiliana, Daniel Eddieson A. Gutierrez, Loridee Angel B. Ocampo and Shiela Mae S. Arucan
260 _aBayombong:
_bNueva Vizcaya State University,
_c2023.
300 _avii, 149 leaves :
_billustrations, photos ;
_c28 cm.
500 _a The integration of all the construction activities and stages required to execute a specific contraction project within a specified budget and time period depends critically on construction planning and scheduling Technology must be chosen, work tasks must be specified, the resources and time required for each activity must be estimated, and any links between the various tasks must be identified. The primary goal of the study is to determine the planning and scheduling of construction or improving access roads leading to designated tourist locations. Construction planning ensures that the project will be finished on schedule, within budget, and under quality standards. It also ensures worker safety procedures. Additionally, it aims to demonstrate a cost-effective method for organizing and scheduling a building project. The researchers provided an Estimation computation, Network Diagram, Gantt Chart, and S-Curve. According to the estimated cost of 9,984,542,46 pesos allotted for the construction of a drainage system, a structure to protect the slope, and the installation of thermoplastic pavement markings, the length of the road network was calculated to be 346 meters. Activity Sequence displays 28 activities for the project. The project's inflection point occurs in week 3, with 19.71% progress. Growth slows in week 4, reaching maturity in week 6, and accelerating in week 7, indicating completion. The Network Diagram displays the project's activities, with a 62-day critical path, focusing on the longest sequences required for completion. AutoCAD and Microsoft Excel are used to develop, edit, analyze, and track project progress. It is recommended to try using the Microsoft Project as it provides efficient features for creating schedules, plans, resources, and time tracking Keywords: Planning, Scheduling, Road Infrastructure, Detailed Estimates, Activity Sequence, Gantt Shart, S-Curve, Program Evaluation and Review Technique, Critical Path Method.
500 _aResearch paper (Bachelor of Science in Civil Engineering)
504 _aIncludes bibliographical references and appendices
700 _aPerhiliana, Jaylord P., author.
700 _aGutierrez, Daniel Eddieson A., author.
700 _aOcampo, Loridee Angel B., author.
700 _aArucan, Shiela Mae S., author.
942 _2ddc
_cU
_n0
999 _c467
_d467