<?xml version="1.0" encoding="UTF-8"?>
<mods xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.1" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
  <titleInfo>
    <title>Factors of delay on the completion of the “construction of campus drainage system/flood control bayombong campus</title>
  </titleInfo>
  <name type="personal">
    <namePart>Distor, Jet Brian H.</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Lumanog, Thomas Gabriel B., author.</namePart>
  </name>
  <name type="personal">
    <namePart>Paringit, Uniz Elizee D., author.</namePart>
  </name>
  <name type="personal">
    <namePart>Rivera, Symon Justine A., author.</namePart>
  </name>
  <name type="personal">
    <namePart>Saguid, Janica Mae D., author.</namePart>
  </name>
  <name type="personal">
    <namePart>Sesbreno, Nicole Angela C., author.</namePart>
  </name>
  <typeOfResource>text</typeOfResource>
  <originInfo>
    <place>
      <placeTerm type="text">Bayombong</placeTerm>
    </place>
    <publisher>Nueva Vizcaya State University</publisher>
    <dateIssued>2023</dateIssued>
    <issuance>monographic</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <form authority="marcform">print</form>
    <extent>vi, 40 leaves : illustrations, photos ; 28 cm.</extent>
  </physicalDescription>
  <note type="statement of responsibility">Jet Brian H. Distor, Thomas Gabriel B. Lumanog, Uniz Elizee D. Paringit, Symon Justine A. Rivera, Janica Mae D. Saguid, Nicole Angela C. Sesbreno</note>
  <note>	This study was conducted to determine the factors causing delay in the completion of "Construction of Drainage Canal System Flood Control, Bayombong Campus." Three factors, Le, manpower, weather conditions, and construction strategies, were given locus. Data were obtained through a survey and analyzed using a descriptive-qualitative research design
	Results of the study showed that a shortage of manpower was the primary cause of delay in terms of manpower, typhoons in terms of weather conditions, and budget inaccuracies in terms of construction strategies.
	It is recommended that project managers develop contingency plans to mitigate the effects of these factors on project timelines. In addition, it is also advised that project stakeholders work together to ensure proper planning, execution, and monitoring of projects to minimize delays and ensure timely project completion.
Keywords: delay, construction, manpower factors, weather condition factors, construction strategies factors
</note>
  <note>Research paper (Bachelor of Science in Civil Engineering)</note>
  <note>Includes bibliographical references and appendices</note>
  <recordInfo>
    <recordContentSource authority="marcorg"/>
    <recordCreationDate encoding="marc">250328</recordCreationDate>
    <recordChangeDate encoding="iso8601">20250328162137.0</recordChangeDate>
  </recordInfo>
</mods>
