<?xml version="1.0" encoding="UTF-8"?>
<record
    xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"
    xsi:schemaLocation="http://www.loc.gov/MARC21/slim http://www.loc.gov/standards/marcxml/schema/MARC21slim.xsd"
    xmlns="http://www.loc.gov/MARC21/slim">

  <leader>02546nam a22002057a 4500</leader>
  <controlfield tag="003">OSt</controlfield>
  <controlfield tag="005">20250321101529.0</controlfield>
  <controlfield tag="008">250321b        |||||||| |||| 00| 0 eng d</controlfield>
  <datafield tag="040" ind1=" " ind2=" ">
    <subfield code="c">NVSU</subfield>
  </datafield>
  <datafield tag="100" ind1=" " ind2=" ">
    <subfield code="a">Ramos, Lyka Jane L.</subfield>
  </datafield>
  <datafield tag="245" ind1=" " ind2=" ">
    <subfield code="a"> Cause and mitigation strategies on the cost overruns of the municipal engineering office projects/</subfield>
    <subfield code="c">Lyka Jane L. Ramos, Kezy N. Raros and Frecy C. Tuliao</subfield>
  </datafield>
  <datafield tag="260" ind1=" " ind2=" ">
    <subfield code="a">Bayombong:</subfield>
    <subfield code="b">Nueva Vizcaya State University,</subfield>
    <subfield code="c">2024.</subfield>
  </datafield>
  <datafield tag="300" ind1=" " ind2=" ">
    <subfield code="a">vi, 57 leaves :</subfield>
    <subfield code="b">illustrations (some colored), photos ;</subfield>
    <subfield code="c">28 cm.</subfield>
  </datafield>
  <datafield tag="500" ind1=" " ind2=" ">
    <subfield code="a">	This research study, entitled "Cause and Mitigation Strategies on the Cost Overruns of the Municipal Engineering Office Projects&#x201D;, aims to identify key objectives: (a) construction projects that contribute to cost overruns at the Municipal Engineering Office (MEO), (b) factors causing these overruns, and (c) mitigation strategies through construction management to prevent cost overruns and delays. Utilizing a quantitative research design, the researchers employed questionnaires and document analysis to gather necessary information. Respondents included personnel from the Municipal Engineering Office of Bambang, Nueva Vizcaya. Data analysis involved statistical methods such as measures of central tendency (mean) and variability (standard deviation). Notably, the project documents showed an absence of cost overruns, indicating effective project management. The study identified several factors contributing to cost overruns, including initial project budgeting issues, use of low-quality materials, and delayed designs and documents. To address these challenges, the study proposed mitigation strategies like thorough project planning, transparent financial statements, and frequent site visits, which were found to be effective in managing and preventing cost overruns in construction projects. These findings highlight the importance of meticulous planning and transparent communication in construction management to ensure projects stay within budget and are completed on time, thereby contributing to the overall efficiency and success of municipal construction projects.
Keywords: Cost overruns, construction projects, mitigation strategies, Municipal Engineering Office, construction management</subfield>
  </datafield>
  <datafield tag="500" ind1=" " ind2=" ">
    <subfield code="a">Research paper (Bachelor of Science in Civil Engineering - Construction 
Engineering Management)
</subfield>
  </datafield>
  <datafield tag="504" ind1=" " ind2=" ">
    <subfield code="a">Includes bibliographical references and appendices</subfield>
  </datafield>
  <datafield tag="700" ind1=" " ind2=" ">
    <subfield code="a">Raros, Kezy N., author.</subfield>
  </datafield>
  <datafield tag="700" ind1=" " ind2=" ">
    <subfield code="a">Tuliao, Frecy C., author.</subfield>
  </datafield>
  <datafield tag="942" ind1=" " ind2=" ">
    <subfield code="2">ddc</subfield>
    <subfield code="c">U</subfield>
    <subfield code="n">0</subfield>
  </datafield>
  <datafield tag="999" ind1=" " ind2=" ">
    <subfield code="c">264</subfield>
    <subfield code="d">264</subfield>
  </datafield>
  <datafield tag="952" ind1=" " ind2=" ">
    <subfield code="0">0</subfield>
    <subfield code="1">0</subfield>
    <subfield code="2">ddc</subfield>
    <subfield code="4">0</subfield>
    <subfield code="7">0</subfield>
    <subfield code="a">NVSUBAY</subfield>
    <subfield code="b">NVSUBAY</subfield>
    <subfield code="c">GR</subfield>
    <subfield code="d">2025-03-21</subfield>
    <subfield code="e">Donation</subfield>
    <subfield code="l">0</subfield>
    <subfield code="o">U (BSCE) R175c 2024</subfield>
    <subfield code="p">U2389</subfield>
    <subfield code="r">2025-03-21 10:16:07</subfield>
    <subfield code="w">2025-03-21</subfield>
    <subfield code="y">U</subfield>
  </datafield>
</record>
