<?xml version="1.0" encoding="UTF-8"?>
<record
    xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"
    xsi:schemaLocation="http://www.loc.gov/MARC21/slim http://www.loc.gov/standards/marcxml/schema/MARC21slim.xsd"
    xmlns="http://www.loc.gov/MARC21/slim">

  <leader>02552nam a22002177a 4500</leader>
  <controlfield tag="003">OSt</controlfield>
  <controlfield tag="005">20250321095027.0</controlfield>
  <controlfield tag="008">250321b        |||||||| |||| 00| 0 eng d</controlfield>
  <datafield tag="040" ind1=" " ind2=" ">
    <subfield code="c">NVSU</subfield>
  </datafield>
  <datafield tag="100" ind1=" " ind2=" ">
    <subfield code="a">Geron, Rosemarie A.</subfield>
  </datafield>
  <datafield tag="245" ind1=" " ind2=" ">
    <subfield code="a">Project monitoring in quality assurance and its impact to the selected constitution firm/</subfield>
    <subfield code="c">Rosemarie A. Geron, Rae Jan S. Lumidao, Kenneth Bryan M. Mari&#xF1;as and Joshua Nhel A. Simon</subfield>
  </datafield>
  <datafield tag="260" ind1=" " ind2=" ">
    <subfield code="a">Bayombong:</subfield>
    <subfield code="b">Nueva Vizcaya State University,</subfield>
    <subfield code="c">2024.</subfield>
  </datafield>
  <datafield tag="300" ind1=" " ind2=" ">
    <subfield code="a">x, 44 leaves :</subfield>
    <subfield code="b">illustrations (some colored), photos ;</subfield>
    <subfield code="c">28 cm.</subfield>
  </datafield>
  <datafield tag="500" ind1=" " ind2=" ">
    <subfield code="a">	The construction industry is integral to economic development and infrastructure expansion, yet it faces persistent challenges such as cost overruns, project delays, safety concerns, and environmental impacts. Effective project monitoring for evaluation has emerged as a critical practice to address these issues, ensuring the successful completion of construction projects. This study investigates the impact of project monitoring on quality assurance within construction firms in Bayombong, Nueva Vizcaya. Through a comprehensive survey of 70 construction workers and engineers, the study evaluates existing project monitoring practices, identifies their strengths and weaknesses, and provides actionable recommendations for improvement. The research reveals that majority of respondents (42.59%) were age of 26-35, with a predominantly male representation (92.88%). Project monitoring practices were positively rated, with an overall mean rating of 2.381 indicating a significant positive influence on quality assurance. However, it also identifies stakeholder engagement and performance benchmarking as areas needing enhancement. Recommendations for improvement include seeking client and stakeholder feedback, enhancing communication channels, conducting regular quality audits, and defining clear quality objectives. This study contributes to the growing body of knowledge on project monitoring in the construction industry, offering insights that can guide industry professionals and policymakers toward more efficient, cost-effective, and sustainable practices.
Keywords: assurance, construction industry, monitoring, safety</subfield>
  </datafield>
  <datafield tag="500" ind1=" " ind2=" ">
    <subfield code="a">Research paper (Bachelor of Science in Civil Engineering - Construction 
Engineering Management)</subfield>
  </datafield>
  <datafield tag="504" ind1=" " ind2=" ">
    <subfield code="a">Includes bibliographical references and appendices</subfield>
  </datafield>
  <datafield tag="700" ind1=" " ind2=" ">
    <subfield code="a">Lumidao, Rae Jan S., author.</subfield>
  </datafield>
  <datafield tag="700" ind1=" " ind2=" ">
    <subfield code="a">Mari&#xF1;as, Kenneth Bryan M., author.</subfield>
  </datafield>
  <datafield tag="700" ind1=" " ind2=" ">
    <subfield code="a">Simon, Joshua Nhel A., author.</subfield>
  </datafield>
  <datafield tag="942" ind1=" " ind2=" ">
    <subfield code="2">ddc</subfield>
    <subfield code="c">U</subfield>
    <subfield code="n">0</subfield>
  </datafield>
  <datafield tag="999" ind1=" " ind2=" ">
    <subfield code="c">251</subfield>
    <subfield code="d">251</subfield>
  </datafield>
  <datafield tag="952" ind1=" " ind2=" ">
    <subfield code="0">0</subfield>
    <subfield code="1">0</subfield>
    <subfield code="2">ddc</subfield>
    <subfield code="4">0</subfield>
    <subfield code="7">0</subfield>
    <subfield code="a">NVSUBAY</subfield>
    <subfield code="b">NVSUBAY</subfield>
    <subfield code="c">GR</subfield>
    <subfield code="d">2025-03-21</subfield>
    <subfield code="e">Donation</subfield>
    <subfield code="l">0</subfield>
    <subfield code="o">U (BSCE) G377p 2024</subfield>
    <subfield code="p">U2392</subfield>
    <subfield code="r">2025-03-21 09:51:08</subfield>
    <subfield code="w">2025-03-21</subfield>
    <subfield code="y">U</subfield>
  </datafield>
</record>
