<?xml version="1.0" encoding="UTF-8"?>
<mods xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" version="3.1" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
  <titleInfo>
    <title>Civil works construction project management and cost estimation of a proposed modernized modal terminal with two-storey commercial stalls</title>
  </titleInfo>
  <name type="personal">
    <namePart>Casticimo, Jessa Mae P.</namePart>
    <role>
      <roleTerm authority="marcrelator" type="text">creator</roleTerm>
    </role>
  </name>
  <name type="personal">
    <namePart>Cheg-ao, Hazel Ruth A., author.</namePart>
  </name>
  <name type="personal">
    <namePart>Paud,  Renzyl Kate H., author.</namePart>
  </name>
  <typeOfResource>text</typeOfResource>
  <originInfo>
    <place>
      <placeTerm type="text">Bayombong</placeTerm>
    </place>
    <publisher>Nueva Vizcaya State University</publisher>
    <dateIssued>2024</dateIssued>
    <issuance>monographic</issuance>
  </originInfo>
  <language>
    <languageTerm authority="iso639-2b" type="code">eng</languageTerm>
  </language>
  <physicalDescription>
    <form authority="marcform">print</form>
    <extent>ix, 117 leaves : illustrations (some colored) ; 28 cm.</extent>
  </physicalDescription>
  <note type="statement of responsibility">Jessa Mae P. Casticimo, Hazel Ruth A. Cheg-ao and Renzyl Kate H. Paud</note>
  <note>	Transportation plays a crucial role in shaping modern society, serving lifeblood that connects people, communities, and economies. It enables the movement of goods and individuals, facilitates economic growth. and enhances the quality of life. Understanding the importance of transportation is key to addressing contemporary challenges and building sustainable, efficient, and inclusive societies.

	This study aims to determine the estimated cost and duration of the civil works for the proposed project, which is a Modernized Modal Terminal with Two-Storey Commercial Stalls. The cost estimation considers various factors such as materials, labor, equipment, and indirect costs that contribute to the civil works project expenses. The Department of Public Works and Highways' Cost Estimation Manual for Low-Rise Buildings was utilized in computing the Detailed Unit Price for material, labor, equipment, and indirect costs.

	Additionally, a Gantt chart and s-curve was created based on the project duration. The findings indicate that the total cost for the civil works amounts to P22,913,937.45 with a duration of 211 working days. Excluding the indirect expenses, the computed material cost is P10,522,684.88, the labor cost is P5,409,927.64, and the equipment cost is P2,253,052.12. The indirect cost, which includes 12% OCM, 8% Contractor's profit, and 5% VAT, costs P4,728,272.81.</note>
  <note>Research paper (Bachelor of Science in Civil Engineering - Construction 
Engineering Management)</note>
  <note>Includes bibliographical references and appendices</note>
  <recordInfo>
    <recordContentSource authority="marcorg"/>
    <recordCreationDate encoding="marc">250320</recordCreationDate>
    <recordChangeDate encoding="iso8601">20250320160105.0</recordChangeDate>
  </recordInfo>
</mods>
