Factors of delay on the completion of the “construction of campus drainage system/flood control bayombong campus/ (Record no. 523)

MARC details
000 -LEADER
fixed length control field 02053nam a22002417a 4500
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20250328162137.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 250328b |||||||| |||| 00| 0 eng d
040 ## - CATALOGING SOURCE
Transcribing agency NVSU
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Distor, Jet Brian H.
245 ## - TITLE STATEMENT
Title Factors of delay on the completion of the “construction of campus drainage system/flood control bayombong campus/
Statement of responsibility, etc. Jet Brian H. Distor, Thomas Gabriel B. Lumanog, Uniz Elizee D. Paringit, Symon Justine A. Rivera, Janica Mae D. Saguid, Nicole Angela C. Sesbreno
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Bayombong:
Name of publisher, distributor, etc. Nueva Vizcaya State University,
Date of publication, distribution, etc. 2023.
300 ## - PHYSICAL DESCRIPTION
Extent vi, 40 leaves :
Other physical details illustrations, photos ;
Dimensions 28 cm.
500 ## - GENERAL NOTE
General note This study was conducted to determine the factors causing delay in the completion of "Construction of Drainage Canal System Flood Control, Bayombong Campus." Three factors, Le, manpower, weather conditions, and construction strategies, were given locus. Data were obtained through a survey and analyzed using a descriptive-qualitative research design<br/> Results of the study showed that a shortage of manpower was the primary cause of delay in terms of manpower, typhoons in terms of weather conditions, and budget inaccuracies in terms of construction strategies.<br/> It is recommended that project managers develop contingency plans to mitigate the effects of these factors on project timelines. In addition, it is also advised that project stakeholders work together to ensure proper planning, execution, and monitoring of projects to minimize delays and ensure timely project completion.<br/>Keywords: delay, construction, manpower factors, weather condition factors, construction strategies factors<br/>
500 ## - GENERAL NOTE
General note Research paper (Bachelor of Science in Civil Engineering)
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Includes bibliographical references and appendices
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Lumanog, Thomas Gabriel B., author.
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Paringit, Uniz Elizee D., author.
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Rivera, Symon Justine A., author.
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Saguid, Janica Mae D., author.
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Sesbreno, Nicole Angela C., author.
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Undergraduate Research
Suppress in OPAC No
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Shelving location Date acquired Source of acquisition Total checkouts Full call number Barcode Date last seen Price effective from Koha item type
    Dewey Decimal Classification     Nueva Vizcaya State University - Bayombong Campus Nueva Vizcaya State University - Bayombong Campus General Reference Section 03/28/2025 Donation   U (BSCE) D614f 2023 U2044 03/28/2025 03/28/2025 Undergraduate Research

NUEVA VIZCAYA STATE UNIVERSITY

A leading University in education, innovation and sustainable development

@2024 NVSU | Powered by : Koha