Performance management strategies related to planning scheduling, and quality control of material on the construction of three-storey residential building/ (Record no. 521)
[ view plain ]
| 000 -LEADER | |
|---|---|
| fixed length control field | 02568nam a22002177a 4500 |
| 003 - CONTROL NUMBER IDENTIFIER | |
| control field | OSt |
| 005 - DATE AND TIME OF LATEST TRANSACTION | |
| control field | 20250328161553.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
| fixed length control field | 250328b |||||||| |||| 00| 0 eng d |
| 040 ## - CATALOGING SOURCE | |
| Transcribing agency | NVSU |
| 100 ## - MAIN ENTRY--PERSONAL NAME | |
| Personal name | Au, Trista Janelle G. |
| 245 ## - TITLE STATEMENT | |
| Title | Performance management strategies related to planning scheduling, and quality control of material on the construction of three-storey residential building/ |
| Statement of responsibility, etc. | Trista Janelle G. Au, Shaine Maycah G. Herrera, Jorelle Pendon and Rogenna L. Perez |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. | |
| Place of publication, distribution, etc. | Bayombong: |
| Name of publisher, distributor, etc. | Nueva Vizcaya State University, |
| Date of publication, distribution, etc. | 2023. |
| 300 ## - PHYSICAL DESCRIPTION | |
| Extent | vii, 55 leaves : |
| Other physical details | illustrations, photos ; |
| Dimensions | 28 cm. |
| 500 ## - GENERAL NOTE | |
| General note | The study that was conducted is a qualitative-quantitative study which aims to determine and classify the performance management strategies related to planning. scheduling, and quality control of materials in the construction of the three-storey residential building. A structured survey questionnaire was taken into consideration in collecting data containing categorized performance management strategies under planning. scheduling, and quality control of materials.<br/> The study revealed that the given performance management strategies related to planning: Understanding the project scope, Methods are used to plan construction project, Labor and equipment need are considered when planning the construction project, scheduling: Activities are done on a scheduled time to prevent possible slippage on the project, Scheduled days based on the scope of works of the construction project are being met and quality control of materials: Materials are being tested before using it for construction, Equipment is used to maintain the quality of materials, Procedures for quality control of materials are being documented and tracked are always utilized in the construction of the three-storey residential building. Furthermore, potential construction issues can be solved when these determined performance management strategies are implemented effectively, leading to the conclusion that these performance management strategies have a significant impact on entire construction projects in terms of planning, scheduling, and quality control of materials.<br/>Keywords: Performance management strategies, planning, scheduling, quality control of materials<br/> |
| 500 ## - GENERAL NOTE | |
| General note | Research paper (Bachelor of Science in Civil Engineering) |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE | |
| Bibliography, etc. note | Includes bibliographical references and appendices |
| 700 ## - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Herrera, Shaine Maycah G., author. |
| 700 ## - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Pendon, Jorelle, author. |
| 700 ## - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Perez, Rogenna L., author. |
| 942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
| Source of classification or shelving scheme | Dewey Decimal Classification |
| Koha item type | Undergraduate Research |
| Suppress in OPAC | No |
| Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Home library | Current library | Shelving location | Date acquired | Source of acquisition | Total checkouts | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Dewey Decimal Classification | Nueva Vizcaya State University - Bayombong Campus | Nueva Vizcaya State University - Bayombong Campus | General Reference Section | 03/28/2025 | Donation | U (BSCE) Au887p 2023 | U2034 | 03/28/2025 | 03/28/2025 | Undergraduate Research |