Planning and scheduling of construction improvements of access roads leading to declared tourism destinations/ (Record no. 467)
[ view plain ]
| 000 -LEADER | |
|---|---|
| fixed length control field | 02961nam a22002297a 4500 |
| 003 - CONTROL NUMBER IDENTIFIER | |
| control field | OSt |
| 005 - DATE AND TIME OF LATEST TRANSACTION | |
| control field | 20250328142043.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
| fixed length control field | 250328b |||||||| |||| 00| 0 eng d |
| 040 ## - CATALOGING SOURCE | |
| Transcribing agency | NVSU |
| 100 ## - MAIN ENTRY--PERSONAL NAME | |
| Personal name | Pesa, Xavier A. |
| 245 ## - TITLE STATEMENT | |
| Title | Planning and scheduling of construction improvements of access roads leading to declared tourism destinations/ |
| Statement of responsibility, etc. | Xavier A. Pesa, Jaylord P. Perhiliana, Daniel Eddieson A. Gutierrez, Loridee Angel B. Ocampo and Shiela Mae S. Arucan |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. | |
| Place of publication, distribution, etc. | Bayombong: |
| Name of publisher, distributor, etc. | Nueva Vizcaya State University, |
| Date of publication, distribution, etc. | 2023. |
| 300 ## - PHYSICAL DESCRIPTION | |
| Extent | vii, 149 leaves : |
| Other physical details | illustrations, photos ; |
| Dimensions | 28 cm. |
| 500 ## - GENERAL NOTE | |
| General note | The integration of all the construction activities and stages required to execute a specific contraction project within a specified budget and time period depends critically on construction planning and scheduling Technology must be chosen, work tasks must be specified, the resources and time required for each activity must be estimated, and any links between the various tasks must be identified.<br/><br/>The primary goal of the study is to determine the planning and scheduling of construction or improving access roads leading to designated tourist locations. Construction planning ensures that the project will be finished on schedule, within budget, and under quality standards. It also ensures worker safety procedures. Additionally, it aims to demonstrate a cost-effective method for organizing and scheduling a building project.<br/><br/>The researchers provided an Estimation computation, Network Diagram, Gantt Chart, and S-Curve. According to the estimated cost of 9,984,542,46 pesos allotted for the construction of a drainage system, a structure to protect the slope, and the installation of thermoplastic pavement markings, the length of the road network was calculated to be 346 meters.<br/>Activity Sequence displays 28 activities for the project. The project's inflection point occurs in week 3, with 19.71% progress. Growth slows in week 4, reaching maturity in week 6, and accelerating in week 7, indicating completion.<br/><br/>The Network Diagram displays the project's activities, with a 62-day critical path, focusing on the longest sequences required for completion. AutoCAD and Microsoft Excel are used to develop, edit, analyze, and track project progress.<br/><br/>It is recommended to try using the Microsoft Project as it provides efficient features for creating schedules, plans, resources, and time tracking<br/>Keywords: Planning, Scheduling, Road Infrastructure, Detailed Estimates, Activity Sequence, Gantt Shart, S-Curve, Program Evaluation and Review Technique, Critical Path Method. |
| 500 ## - GENERAL NOTE | |
| General note | Research paper (Bachelor of Science in Civil Engineering) |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE | |
| Bibliography, etc. note | Includes bibliographical references and appendices |
| 700 ## - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Perhiliana, Jaylord P., author. |
| 700 ## - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Gutierrez, Daniel Eddieson A., author. |
| 700 ## - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Ocampo, Loridee Angel B., author. |
| 700 ## - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Arucan, Shiela Mae S., author. |
| 942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
| Source of classification or shelving scheme | Dewey Decimal Classification |
| Koha item type | Undergraduate Research |
| Suppress in OPAC | No |
| Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Home library | Current library | Shelving location | Date acquired | Source of acquisition | Total checkouts | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Dewey Decimal Classification | Nueva Vizcaya State University - Bayombong Campus | Nueva Vizcaya State University - Bayombong Campus | General Reference Section | 03/28/2025 | Donation | U (BSCE) P472p 2023 | U2042 | 03/28/2025 | 03/28/2025 | Undergraduate Research |