Comparative study of factors affecting the construction labor productivity of five construction companies in Nueva Vizcaya/ (Record no. 431)

MARC details
000 -LEADER
fixed length control field 02462nam a22002177a 4500
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20250328084456.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 250328b |||||||| |||| 00| 0 eng d
040 ## - CATALOGING SOURCE
Transcribing agency NVSU
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Baloro, Gwendolene J.
245 ## - TITLE STATEMENT
Title Comparative study of factors affecting the construction labor productivity of five construction companies in Nueva Vizcaya/
Statement of responsibility, etc. Gwendolene J. Baloro, Ginel T. Guyong, Angelica R. Jornacion and Mahonri Grant A. Tolentino
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Bayombong:
Name of publisher, distributor, etc. Nueva Vizcaya State University,
Date of publication, distribution, etc. 2023.
300 ## - PHYSICAL DESCRIPTION
Extent viii, 50 leaves :
Other physical details illustrations, photos ;
Dimensions 28 cm.
500 ## - GENERAL NOTE
General note Construction labor productivity have become part of the issues that significantly affect the construction industry, more specifically the performance of construction projects. Therefore, it is necessary to understand how the project managers, engineers and other related jobs in this field take this as a part of the study. The study compares the construction labor productivity of five construction companies using a 4-poin Likert scale questionnaire. The questionnaire was composed of major reasons, possible interventions, and processes to help prevent construction labor productivity from dropping. The collected date through floating a questionnaire were analyzed based on frequencies, percentage, mean and quantitative description.<br/>The study revealed that EPN Builders and Alfalfa Construction both answered weather condition as the major factor affecting construction labor productivity while B. Flores Construction Company stated that unscheduled extra work affects the most, in the other hand BRG Company declared that numbers of workers on site rank first and JKCEZ Construction specified that site layout affects the most. Furthermore the study also revealed that the companies believes that inspection of work, record keeping, monitoring of work, and effective communication between a project's internal and external stakeholders are the most effective possible interventions. Moreover, through keeping planning scope, thorough project planning and planning the project accurately will help prevent the construction productivity from dropping.<br/>
500 ## - GENERAL NOTE
General note Research paper (Bachelor of Science in Civil Engineering)
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Includes bibliographical references and appendices
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Guyong, Ginel T., author.
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Jornacion, Angelica R., author.
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Tolentino, Mahonri Grant A., author.
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Undergraduate Research
Suppress in OPAC No
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Shelving location Date acquired Source of acquisition Total checkouts Full call number Barcode Date last seen Price effective from Koha item type
    Dewey Decimal Classification     Nueva Vizcaya State University - Bayombong Campus Nueva Vizcaya State University - Bayombong Campus General Reference Section 03/28/2025 Donation   U (BSCE) B195c 2023 U2037 03/28/2025 03/28/2025 Undergraduate Research

NUEVA VIZCAYA STATE UNIVERSITY

A leading University in education, innovation and sustainable development

@2024 NVSU | Powered by : Koha