Construction project management of proposed three-storey academic building/ (Record no. 350)
[ view plain ]
| 000 -LEADER | |
|---|---|
| fixed length control field | 02537nam a22002417a 4500 |
| 003 - CONTROL NUMBER IDENTIFIER | |
| control field | OSt |
| 005 - DATE AND TIME OF LATEST TRANSACTION | |
| control field | 20250321150828.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
| fixed length control field | 250321b |||||||| |||| 00| 0 eng d |
| 040 ## - CATALOGING SOURCE | |
| Transcribing agency | NVSU |
| 100 ## - MAIN ENTRY--PERSONAL NAME | |
| Personal name | Ballesteros, Mae Pearl |
| 245 ## - TITLE STATEMENT | |
| Title | Construction project management of proposed three-storey academic building/ |
| Statement of responsibility, etc. | Mae Pearl Ballesteros, Riza Mae Balladares, Lovely Faith Ringor, Alyssa Grace Bayag, Jan Alvin Gombio and Deo Corpuz II |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. | |
| Place of publication, distribution, etc. | Bayombong: |
| Name of publisher, distributor, etc. | Nueva Vizcaya State University, |
| Date of publication, distribution, etc. | 2023. |
| 300 ## - PHYSICAL DESCRIPTION | |
| Extent | ix, 245 leaves : |
| Other physical details | illustrations (some colored) ; |
| Dimensions | 28 cm. |
| 500 ## - GENERAL NOTE | |
| General note | Project management is a tool used to maximize the use of commodities and resources available to fulfill certain project goals, and the success of the project is defined by how well it is managed. Project management can be described as the processes of carefully planning, organizing, controlling, and motivating the organization's resources in order to foster and facilitate the achievement of specific established and desired goals, as well as meeting the specific success criteria required in the organization (Larson, 2014).<br/> The present study seeks to identify the total cost and maximum duration, as well as to assist the budget process by providing estimates of the funding necessary to properly execute the proposed three-story academic building's construction. To achieve these goals, cost estimating takes into account all necessary materials, labor, and equipment, as well as indirect and engineering costs that contribute to the project's bottom line. The current DPWH rates are used to calculate material costs, labor rates, equipment rates, and production rates. Based on the projected duration, a Gantt chart and project schedule were created.<br/> Based on the study, the total projected building cost is Php 42,772,253.57. Without considering indirect expenses, the computed material costs Php 25,760,672.29, labor costs Php 5,341,546.22, and equipment costs Php 2,118,949.31, for a total direct cost of Php 33,221,167.82. Indirect costs consist of a 12% OCM, a 5% VAT, and an 8% profit, totaling Php 8,305,291.96. |
| 500 ## - GENERAL NOTE | |
| General note | Research paper (Bachelor of Science in Civil Engineering - Construction <br/>Engineering Management) |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE | |
| Bibliography, etc. note | Includes bibliographical references and appendices |
| 700 ## - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Balladares, Riza Mae, author. |
| 700 ## - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Ringor, Lovely Faith, author. |
| 700 ## - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Bayag, Alyssa Grace, author. |
| 700 ## - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Gombio, Jan Alvin, author. |
| 700 ## - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Corpuz II, Deo, author. |
| 942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
| Source of classification or shelving scheme | Dewey Decimal Classification |
| Koha item type | Undergraduate Research |
| Suppress in OPAC | No |
| Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Home library | Current library | Shelving location | Date acquired | Source of acquisition | Total checkouts | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Dewey Decimal Classification | Nueva Vizcaya State University - Bayombong Campus | Nueva Vizcaya State University - Bayombong Campus | General Reference Section | 03/21/2025 | Donation | U (BSCE) B191c 2023 | U2045 | 03/21/2025 | 03/21/2025 | Undergraduate Research |