Project management of the propose 3-storey academic building (COE) at Nueva Vizcaya State University Bayombong campus/ (Record no. 333)

MARC details
000 -LEADER
fixed length control field 02472nam a22002297a 4500
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20250321143000.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 250321b |||||||| |||| 00| 0 eng d
040 ## - CATALOGING SOURCE
Transcribing agency NVSU
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Garing Jr., Wilfred C.
245 ## - TITLE STATEMENT
Title Project management of the propose 3-storey academic building (COE) at Nueva Vizcaya State University Bayombong campus/
Statement of responsibility, etc. Wilfred C. Garing Jr., Freda Joy B. Descargar, Rhoxan Mae A. Driza, Loraine A. Paduyao and Lyka Joy H. Valdez
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Bayombong:
Name of publisher, distributor, etc. Nueva Vizcaya State University,
Date of publication, distribution, etc. 2023.
300 ## - PHYSICAL DESCRIPTION
Extent viii, 252 leaves :
Other physical details illustrations, photos ;
Dimensions 28 cm.
500 ## - GENERAL NOTE
General note This paper studied the estimated cost of the proposed academic building, one of the construction projects using computer-aided software for cost estimates that provided comprehension by putting a cost estimate management approach to be use. For a project to be deemed successful upon completion, the process of creating a thorough project cost estimate is essential. One of the most important and often used project management tools is project costing. It is impossible to predict exact budget demands due to the complexity of projects, the inherent uncertainty of financial performance of building projects, development finance, and the monitoring and regulating of costs and deadlines. <br/><br/> The researchers emphasized the usage of standard practices as well as standard costing for more accurate and reliable estimate. The use of Microsoft Excel was also mentioned as top software used in the process. Data gathered from this are used to elaborate an expected amount of the proposed project. Considering the feasibility of this study in 5 years' time. The calculation of costing is solely based on DPWH rates for materials, labor and equipment. The estimation for the total project cost has standard percentages to be considered. The researchers also took in consideration of some factors that may play valuable part in production rate. The researchers are eager to know the final output and costing for the proposed project in order for project an estimated amount that may carry out the project into action.
500 ## - GENERAL NOTE
General note Research paper (Bachelor of Science in Civil Engineering)
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Includes bibliographical references and appendices
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Descargar, Freda Joy B., author.
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Driza, Rhoxan Mae A., author.
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Paduyao, Loraine A., author.
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Valdez, Lyka Joy H., author.
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Undergraduate Research
Suppress in OPAC No
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Shelving location Date acquired Source of acquisition Total checkouts Full call number Barcode Date last seen Price effective from Koha item type
    Dewey Decimal Classification     Nueva Vizcaya State University - Bayombong Campus Nueva Vizcaya State University - Bayombong Campus General Reference Section 03/21/2025 Donation   U (BSCE) G232p 2023 U2038 03/21/2025 03/21/2025 Undergraduate Research

NUEVA VIZCAYA STATE UNIVERSITY

A leading University in education, innovation and sustainable development

@2024 NVSU | Powered by : Koha