Planning, construction scheduling, and cost estimation of the proposed overload transport integration terminal at Solano, Nueva Vizcaya/ (Record no. 329)

MARC details
000 -LEADER
fixed length control field 02798nam a22002297a 4500
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20250321142050.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 250321b |||||||| |||| 00| 0 eng d
040 ## - CATALOGING SOURCE
Transcribing agency NVSU
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Lorenzo, Mark Anthony A.
245 ## - TITLE STATEMENT
Title Planning, construction scheduling, and cost estimation of the proposed overload transport integration terminal at Solano, Nueva Vizcaya/
Statement of responsibility, etc. Mark Anthony A. Lorenzo, Michael T. Buccahan, Alyzza B. Guillermo, Melvin John M. Quintero and Marjorie M. Taborda
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Bayombong:
Name of publisher, distributor, etc. Nueva Vizcaya State University,
Date of publication, distribution, etc. 2023.
300 ## - PHYSICAL DESCRIPTION
Extent xvi, 254 leaves :
Other physical details illustrations, photos ;
Dimensions 28 cm.
500 ## - GENERAL NOTE
General note This study focuses on the planning, construction scheduling, and cost estimation of the proposed overland transport integrated terminal at Solano, Nueva Vizcaya. It sought answers if the intended location meets the minimum terminal size as required by the LTFRB and have enough space for the proposed land transport integrated terminal to have all its facilities, detailed unit price analysis and bill of quantities and the total calendar days to complete the project construction. This study was conducted to lessen the major problem of a commercial municipality which is the traffic. <br/><br/> This study used the operational framework in presenting the systematic flow of work from planning, construction scheduling and cost estimation. The research utilized the quali-quanti type of research in which the researchers proposed a design of the said terminal through AutoCAD Numerical methods such as computation, plotting of S-curve, Gantt Chart and PERT/CPM were done through Microsoft Excel and Project respectively as part of quantitative method. Processing of letters, consultation of papers and canvassing of price for lists of goods were also done in gathering information. The researchers used the area sampling method in choosing the location for the proposed terminal because of its availability and accessibility. <br/><br/> Based on the major findings, the location meets the need of the proposed terminal in terms of its facilities, the construction has a total calendar day of 254 and amounting to 39,315,682.40 Php. Findings revealed also that the whole project was successfully done in all construction works based on the Gantt chart at S-curve As the major findings were drawn, recommendations and suggestions from LGU Solano, Solano, Nueva Vizcaya, Researchers and Future Researchers were highlighted.
500 ## - GENERAL NOTE
General note Research paper (Bachelor of Science in Civil Engineering)
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Includes bibliographical references and appendices
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Buccahan, Michael T., author.
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Guillermo, Alyzza B., author.
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Quintero, Melvin John M., author.
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Taborda, Marjorie M., author.
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Undergraduate Research
Suppress in OPAC No
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Shelving location Date acquired Source of acquisition Total checkouts Full call number Barcode Date last seen Price effective from Koha item type
    Dewey Decimal Classification     Nueva Vizcaya State University - Bayombong Campus Nueva Vizcaya State University - Bayombong Campus General Reference Section 03/21/2025 Donation   U (BSCE) L869p 2023 U2039 03/21/2025 03/21/2025 Undergraduate Research

NUEVA VIZCAYA STATE UNIVERSITY

A leading University in education, innovation and sustainable development

@2024 NVSU | Powered by : Koha