Issues and problems of the contractors, workers, and clents of Bayombong, Nueva Vizcaya/ (Record no. 323)

MARC details
000 -LEADER
fixed length control field 02082nam a22002297a 4500
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20250321140220.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 250321b |||||||| |||| 00| 0 eng d
040 ## - CATALOGING SOURCE
Transcribing agency NVSU
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Adais, Fevelyn D.
245 ## - TITLE STATEMENT
Title Issues and problems of the contractors, workers, and clents of Bayombong, Nueva Vizcaya/
Statement of responsibility, etc. Fevelyn D. Adais, Ryan Glen C. Lumauig, Aira L. Pugong, Cherdy Zane B. Soria and Melody I. Suminsin
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Bayombong:
Name of publisher, distributor, etc. Nueva Vizcaya State University,
Date of publication, distribution, etc. 2023.
300 ## - PHYSICAL DESCRIPTION
Extent ix, 56 leaves :
Other physical details illustrations, photos ;
Dimensions 28 cm.
500 ## - GENERAL NOTE
General note The construction industry faces challenges and problems that arise from both within and beyond the sector. Construction problems occur much too frequently during a project's life cycle. This study aims to identify the demographic profile of the contractors, workers, and clients of Bayombong, Nueva Vizcaya, the issues and problems they encounter during the construction of projects, and offer possible interventions in addressing the problems/issues encountered. The results show that most of the construction firms operating Bayombong, Nueva Vizcaya were sole-proprietorship type of business, categorized under Class A (General Engineering), deal with multiple construction projects, accept government projects, and offer a variety of services. Meanwhile, most of the contractors consider fortuitous events as the number one problem in the construction projects; the delay of salary was the most concerning problem of respondents, while worker shortage was seen by the clients as the most alarming problem. In order to address the identified problems, the researchers offered a number of recommendations.<br/>Keywords: Construction Problems and Issues, Contractors, Clients, Workers.
500 ## - GENERAL NOTE
General note Thesis (Bachelor of Science in Civil Engineering)
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Includes bibliographical references and appendices
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Lumauig, Ryan Glen C., author.
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Pugong, Aira L., author.
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Soria, Cherdy Zane B., author.
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Suminsin, Melody I., author.
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Undergraduate Research
Suppress in OPAC No
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Shelving location Date acquired Source of acquisition Total checkouts Full call number Barcode Date last seen Price effective from Koha item type
    Dewey Decimal Classification     Nueva Vizcaya State University - Bayombong Campus Nueva Vizcaya State University - Bayombong Campus General Reference Section 03/21/2025 Donation   U (BSCE) Ad191i 2023 U2051 03/21/2025 03/21/2025 Undergraduate Research

NUEVA VIZCAYA STATE UNIVERSITY

A leading University in education, innovation and sustainable development

@2024 NVSU | Powered by : Koha