Construction dilemmas in quality management and conflict resolution in construction projects/ (Record no. 269)

MARC details
000 -LEADER
fixed length control field 02258nam a22002057a 4500
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20250321102438.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 250321b |||||||| |||| 00| 0 eng d
040 ## - CATALOGING SOURCE
Transcribing agency NVSU
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Dantes, Alvin Humprey I.
245 ## - TITLE STATEMENT
Title Construction dilemmas in quality management and conflict resolution in construction projects/
Statement of responsibility, etc. Alvin Humprey I. Dantes, Jonna Ruth C. Hiyaman and Valiza Joy T. Rudio
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Bayombong:
Name of publisher, distributor, etc. Nueva Vizcaya State University,
Date of publication, distribution, etc. 2024.
300 ## - PHYSICAL DESCRIPTION
Extent ix, 58 leaves :
Other physical details illustrations (some colored), photos ;
Dimensions 28 cm.
500 ## - GENERAL NOTE
General note This study assessed the factors influencing construction dilemmas in quality management and conflict resolution in construction projects at NVSU Bayombong and Bambang Campuses. The research sought to identify challenges hindering successful quality management, conflicts compromising quality, and resolutions to address conflicts and compromised quality in construction projects. The data was collected through questionnaires distributed to the project manager, project engineer, foreman, skilled workers, and laborers, resulting in a sample of 39 respondents out of 47. Statistical analysis was conducted using the ANOVA, z-test, Pearson correlation, and a 4-point Likert scale.<br/>The study identified factors impacting construction quality, such as delayed cash flow emerging as the most significant, severe weather, safety concerns, resource constraints, non-compliance issues, language barriers, inadequate training, and ineffective communication. Additionally, the need for days due to variation order, time extension/suspension, and percentage of slippage. The proposed resolutions for conflict resolution encompassed the adoption of technological advancements, reduction of delays and cost overruns, promotion of job satisfaction, implementation of conflict resolution processes, and enhancement of client satisfaction.<br/>Keywords: quality management, construction project, conflict resolution
500 ## - GENERAL NOTE
General note Research paper (Bachelor of Science in Civil Engineering - Construction <br/>Engineering Management)
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Includes bibliographical references and appendices
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Hiyaman, Jonna Ruth C., author.
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Rudio, Valiza Joy T., author.
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Undergraduate Research
Suppress in OPAC No
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Shelving location Date acquired Source of acquisition Total checkouts Full call number Barcode Date last seen Price effective from Koha item type
    Dewey Decimal Classification     Nueva Vizcaya State University - Bayombong Campus Nueva Vizcaya State University - Bayombong Campus General Reference Section 03/21/2025 Donation   U (BSCE) D192c 2024 U2388 03/21/2025 03/21/2025 Undergraduate Research

NUEVA VIZCAYA STATE UNIVERSITY

A leading University in education, innovation and sustainable development

@2024 NVSU | Powered by : Koha