Safety management of construction project initiative, constraints and improvements measures: its implication to selected constructions firms/ (Record no. 212)

MARC details
000 -LEADER
fixed length control field 03911nam a22002177a 4500
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20250320164351.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 250320b |||||||| |||| 00| 0 eng d
040 ## - CATALOGING SOURCE
Transcribing agency NVSU
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Arbiso, Jessalyn K.
245 ## - TITLE STATEMENT
Title Safety management of construction project initiative, constraints and improvements measures: its implication to selected constructions firms/
Statement of responsibility, etc. Jessalyn K. Arbiso, Mary Joy S. Bayating, Bruce B. Curesma and Lea I. Lucquiao
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Bayombong:
Name of publisher, distributor, etc. Nueva Vizcaya State University,
Date of publication, distribution, etc. 2024.
300 ## - PHYSICAL DESCRIPTION
Extent x, 56 leaves :
Other physical details illustrations (some colored), photos ;
Dimensions 28 cm.
500 ## - GENERAL NOTE
General note This study focused on the Safety Management of Construction Project Initiative, Constraints and Improvement Measures: Its Implications to the Selected Construction Firms at Municipality of Bambang and Bayombong Nueva Vizcaya. The selected construction firms having a total of six currently working in Bayombong are the PRIMEBUILT Construction and Supply, having a PCAB Category of B, CDJ Construction and Supply, having a PCAB Category of A, WINLEI Construction and Supply, having a PCAB Category of D, MN Coloma Construction, having a PCAB Category of E, Jhuers Construction, having a PCAB Category of B, and Arnold and Dominador Construction Services, having a PCAB Category of D, while Gercel Construction and Development Group Inc, having a PCAB Category of AAA is currently working in Bambang. All of these selected construction firm has an on-going vertical construction project owned by government.<br/><br/> This study attempted to identify the demographic profile of the respondents, safety management practices present in the selected construction firms, constraints associated with the safety management practices and measures to improve upon safety of new on-going government vertical management project by using Percentage, Frequency Distribution and Measures of Central Tendency.<br/> This study employed descriptive quantitative research design. A survey questionnaire was distributed to the sixty-seven respondents which is divided into two groups. The total of sixty-seven respondents consists of seven foreman, seven project managers, and fifty-three laborers.<br/><br/> The study revealed that majority of workers are all males aging from forty-five years old and above. In addition, most of them has onlv zero to five years length of service. Majority of them starts their work at 7:30 AM and ends at 4:50 PM a day. Moreover, the data gathered shows that the respondents has a high level of safety management practices. Most of the foreman and project managers agreed that lack of ability of the workers can cause accident which means that this is the main constraints associated with the implementation of safety management. Lastly, respondents agreed that service and update equipment regularly is the most priority to improve upon safety.<br/><br/> The results indicated that safety management of construction projects on the selected constructions at Bambang and Bayombong Nueva Vizcaya have high level of safety management practices. But when it comes to constraints, lack of ability of the workers can accident need to be noticed by the foreman or project manager and when it comes to measures upon safety, service and update equipment regularly is highly priority for improvement. Future research is needed to provide stronger and reliable results. It is advised to have a larger respondent and use DOLE (COSH) as their reference in constructing questionnaires. It is also recommended to use advance or modern statistical treatment for their data analysis.
500 ## - GENERAL NOTE
General note Research paper (Bachelor of Science in Civil Engineering - Construction <br/>Engineering Management)<br/>
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Includes bibliographical references and appendices
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Bayating, Mary Joy S., author.
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Curesma, Bruce B., author.
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Lucquiao, Lea I., author.
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Undergraduate Research
Suppress in OPAC No
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Shelving location Date acquired Source of acquisition Total checkouts Full call number Barcode Date last seen Price effective from Koha item type
    Dewey Decimal Classification     Nueva Vizcaya State University - Bayombong Campus Nueva Vizcaya State University - Bayombong Campus General Reference Section 03/20/2025 Donation   U (BSCE) Ar664s 2024 U2223 03/20/2025 03/20/2025 Undergraduate Research

NUEVA VIZCAYA STATE UNIVERSITY

A leading University in education, innovation and sustainable development

@2024 NVSU | Powered by : Koha