Civil works construction project management and cost estimation of a proposed modernized modal terminal with two-storey commercial stalls/ (Record no. 195)

MARC details
000 -LEADER
fixed length control field 02288nam a22002057a 4500
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20250320160105.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 250320b |||||||| |||| 00| 0 eng d
040 ## - CATALOGING SOURCE
Transcribing agency NVSU
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Casticimo, Jessa Mae P.
245 ## - TITLE STATEMENT
Title Civil works construction project management and cost estimation of a proposed modernized modal terminal with two-storey commercial stalls/
Statement of responsibility, etc. Jessa Mae P. Casticimo, Hazel Ruth A. Cheg-ao and Renzyl Kate H. Paud
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Bayombong:
Name of publisher, distributor, etc. Nueva Vizcaya State University,
Date of publication, distribution, etc. 2024.
300 ## - PHYSICAL DESCRIPTION
Extent ix, 117 leaves :
Other physical details illustrations (some colored) ;
Dimensions 28 cm.
500 ## - GENERAL NOTE
General note Transportation plays a crucial role in shaping modern society, serving lifeblood that connects people, communities, and economies. It enables the movement of goods and individuals, facilitates economic growth. and enhances the quality of life. Understanding the importance of transportation is key to addressing contemporary challenges and building sustainable, efficient, and inclusive societies.<br/><br/> This study aims to determine the estimated cost and duration of the civil works for the proposed project, which is a Modernized Modal Terminal with Two-Storey Commercial Stalls. The cost estimation considers various factors such as materials, labor, equipment, and indirect costs that contribute to the civil works project expenses. The Department of Public Works and Highways' Cost Estimation Manual for Low-Rise Buildings was utilized in computing the Detailed Unit Price for material, labor, equipment, and indirect costs.<br/><br/> Additionally, a Gantt chart and s-curve was created based on the project duration. The findings indicate that the total cost for the civil works amounts to P22,913,937.45 with a duration of 211 working days. Excluding the indirect expenses, the computed material cost is P10,522,684.88, the labor cost is P5,409,927.64, and the equipment cost is P2,253,052.12. The indirect cost, which includes 12% OCM, 8% Contractor's profit, and 5% VAT, costs P4,728,272.81.
500 ## - GENERAL NOTE
General note Research paper (Bachelor of Science in Civil Engineering - Construction <br/>Engineering Management)
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Includes bibliographical references and appendices
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Cheg-ao, Hazel Ruth A., author.
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Paud, Renzyl Kate H., author.
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Undergraduate Research
Suppress in OPAC No
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Shelving location Date acquired Source of acquisition Total checkouts Full call number Barcode Date last seen Price effective from Koha item type
    Dewey Decimal Classification     Nueva Vizcaya State University - Bayombong Campus Nueva Vizcaya State University - Bayombong Campus General Reference Section 03/20/2025 Donation   U (BSCE) C351c 2024 U2199 03/20/2025 03/20/2025 Undergraduate Research

NUEVA VIZCAYA STATE UNIVERSITY

A leading University in education, innovation and sustainable development

@2024 NVSU | Powered by : Koha